Process Commissioning Engineer
面議
  • 學(xué)歷要求: 本科及以上
  • 工作經(jīng)驗(yàn): 不限
  • 更新時(shí)間: 2022-02-15
  • 招聘人數(shù): 若干
  • 招聘對(duì)象: 社會(huì)人才
  • 工作地區(qū): 四川-達(dá)州市
張小姐 HR 三個(gè)月前活躍
Job
Description

The role of the Process Commissioning Engineer is to perform
commissioning activities in order to deliver facilities to Operations in
accordance with the project technical standards and schedule. Process
Commissioning Engineer is to provide commissioning support during start-up
activities up to project completion.

 

Key Responsibilities:

1.Participate in all Company HSSE systems and ensure that all work
carried out by all parties engaged in all phases of the project complies with these
requirements.

2.Be familiar with all aspects of project process design and mechanical
equipment.

3.Provide regular communication of system status, schedule issues,
quality issues, etc to the Offshore Commissioning Manager.

4.Be familiar with Project Completions Management Procedure (PTools).
Familiarise oneself with the remaining pre-commissioning and commissioning work
scope for each system. Identify opportunities for early system handover of
systems.

5.Be familiar with the project sub-systems and systems represented on
Limits of System Handover (LOSH) Drawings.

6.Be familiar with the Pre-Commissioning and Commissioning strategy
defined in Core Test Plan

7.Assure rigorous implementation of approved Commissioning Method
Statements and System Commissioning Procedures.

8.Provide support during the execution of the offshore commissioning and
start-up all systems, including being on-board the FPSO to provide technical
support and direction to the integrated team.

9.Review plant performance ****ing procedures and monitor execution of
those procedures to ensure design intent is met.

10.Review/approve and supervise the design and installation of minor
temporary commissioning systems / supplies.

11.Approve PTools ‘B’ check sheets and Commissioning Procedure for Process
discipline.

12.Ensure safety critical Process equipment meets the performance
standards defined in project standard of performance.

13.Ensure that preservation of process piping systems is correctly
identified and is being carried out in accordance with Preservation Procedure.

14.Be familiar with the Project Management of Change Procedure and Site
Change Control and Technical Queries procedure.

15.Ensure all relevant As-Built Drawings / Documents are marked up by
Process commissioning team as defined in project As-Built Procedure

16.When supervising multi-discipline commissioning activities, ensure the
use of overrides and inhibits is correctly controlled as per procedure.

 

Job
Requirements:

1.Extensive experience in Commissioning and Start-Up of rotating
equipment packages on an Oil and Gas Major Project. Additional experience from
Operations would also be an advantage.

2.Knowledge of FPSO process plant, facilities, utilities, and
architecture of surface and subsurface offshore and / or onshore gas and oil
producing facilities.

3.It is expected that the successful candidate will have an engineering
degree or demonstrated extensive experience within the field of commissioning.

 

 工作時(shí)間:做6周(做6休1),休3周

職位類別: 化工項(xiàng)目管理

舉報(bào)
app下載
  • 相似職位
查看更多>
暫沒(méi)有相似職位推薦,立即搜索發(fā)現(xiàn)更多職位
  • 所屬行業(yè):動(dòng)力、電力、機(jī)電設(shè)備
  • 所在地區(qū):上海-市轄區(qū)
  • 聯(lián)系人:張小姐
  • 手機(jī):
    會(huì)員登錄后才可查看
  • 郵箱:會(huì)員登錄后才可查看
  • 郵政編碼:
工作地址
  • 地址:上海市虹莘路3065號(hào)維風(fēng)商務(wù)大廈717室
loading 上傳中

粵公網(wǎng)安備 44030502004569號(hào)